Detroit Foundation Hotel

2018

Turner Brooks recently completed renovating the historic Detroit Fire Department Headquarters into a new boutique hotel. This historic renovation required special techniques to bring the space and materials up to current building codes and specification while still maintaining its historic relevance.

Materials for this project were specifically designed and fabricated for this project, with installation techniques being mandated by the manufacturer to capture the complete design concept. Turner Brooks generated computer models depicting the layout of each unit of material needed. These models were then distributed to the Fabricators and to the Foundation Design Team for review and approval. By working with the entire design team, Turner Brooks and out skilled installation crews were able to deliver this very challenging project on time and on budget.

General Contractor

Sachse Construction

Location

250 W Larned Strret, Detroit, MI 48226

Completion Date

2017

 

Project Scope

Custom Fabricated Wood Planking

Carpet

Apparently we had reached a great height in the atmosphere, for the sky was a dead black, and the stars had ceased to twinkle. By the same illusion which lifts the horizon of the sea to the level of the spectator on a hillside.

Newsletter

Cart

No products in the cart.